Abstract: 

In this paper a novel approach for optimal location, sizing and determining the service areas of HV/MV substations in a long-range planning period using pseudo dynamic methodology is presented. Costs of equipment, areas, cables in MV side and power loss are considered in cost function. Uncertainty in loads is modeled using LR fuzzy numbers in load points. For optimization procedure, genetic algorithm (GA) with a new coding is used. Load points splitting in each area between substations and infeasibility solutions are considered in search procedure. Based on this, software was developed and integrated into an optimization tool for substation allocation. The software was applied in many cases with satisfactory results.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 1265

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Author(s): 

ABSHENAS M. | EDALAT M. | SADR A.

Journal: 

Issue Info: 
  • Year: 

    2002
  • Volume: 

    36
  • Issue: 

    3 (77)
  • Pages: 

    427-437
Measures: 
  • Citations: 

    0
  • Views: 

    1019
  • Downloads: 

    0
Keywords: 
Abstract: 

Storage of natural gas in liquid hydrocarbons is one procedure for automotive natural gas usage that reduces the requirements of high-pressure or cryogenic storage needed in other common techniques such as CNG and LNG. Model solutions of Methane in 52 solvents and Tehran Refinery productions were simulated using various equations of state to determine the pressures necessary to maintain a liquid phase at ambient temperature. The calculation results show that the storage pressure can be reduced to 15 MPa, and due to the storage condition in the liquid phase, the energy density is increased up to almost 40% of the energy density of gasoline. With this technology, the low storage density of CNG and the very low storage temperature of LNG are both overcome, thus dramatically improving the technical feasibility of large-scale commercialization of natural gas powered vehicles.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 1019

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Author(s): 

Khodsouz Masumeh

Issue Info: 
  • Year: 

    2021
  • Volume: 

    11
  • Issue: 

    2
  • Pages: 

    32-41
Measures: 
  • Citations: 

    0
  • Views: 

    140
  • Downloads: 

    0
Abstract: 

Insufficient electrical endurance of equipment and insulation failure against overvoltage are one of the most effective reasons for the failure of the power lines. Lightening, switching, or other disruptive parameters can cause line outage or distribution substation failure. There are different devices used to improve the safety, reliability, and power quality of the system. Surge arresters are one of the insulation protection subsystems used against surge and switching overvoltages. In this paper, the effects of surge arrester performance have been investigated on the insulation system of distribution substation. The study has been done under normal and also transient conditions due to lightning overvoltage. The effects of failure rate, production quality, voltage stress, temperature and surge arrester permutation have been evaluated on surge arrester performances. The influence of surge arrester aging, as the most influential factor on the surge arrester performance, has been investigated as one of the factors involved in the present study. Obtained results have verified the great impact of surge arrester aging effect on the reliability of protection system.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 140

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Author(s): 

Issue Info: 
  • Year: 

    1396
  • Volume: 

    8
  • Issue: 

    4
  • Pages: 

    412-429
Measures: 
  • Citations: 

    1
  • Views: 

    227
  • Downloads: 

    0
Keywords: 
Abstract: 

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 227

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 1 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    2015
  • Volume: 

    30
Measures: 
  • Views: 

    108
  • Downloads: 

    60
Abstract: 

IN RECENT YEARS, SIGNIFICANT RESEARCH EFFORTS HAVEBEEN DEVOTED TO THE OPTIMAL PLANNING OF POWER SYSTEMS.SUBSTATION EXPANSION PLANNING (SEP) AS A SUB-SYSTEM OF POWERSYSTEM PLANNING CONSISTS OF FINDING THE MOST ECONOMICAL SOLUTIONWITH THE OPTIMAL LOCATION AND SIZE OF FUTURE SUBSTATIONS AND/ORFEEDERS TO MEET THE FUTURE DEMAND. THE LARGE NUMBER OF DESIGNVARIABLES, AND COMBINATION OF DISCRETE AND CONTINUOUS VARIABLESMAKES THE SUBSTATION EXPANSION PLANNING A VERY CHALLENGINGPROBLEM. SO FAR, VARIOUS METHODS HAVE BEEN PRESENTED TO SOLVESUCH A COMPLICATED PROBLEM. SINCE THE BACTERIAL FORAGINGOPTIMIZATION ALGORITHM (BFOA) HAS BEEN PROPER RESULTS INSTUDIES OF POWER SYSTEMS, AND HAS NOT BEEN APPLIED TO SEPPROBLEM YET, THIS PAPER DEVELOPS A NEW BFO-BASED METHOD TOSOLVE THE SEP PROBLEM. THE TECHNIQUE DISCUSSED IN THIS PAPERUSES BFOA TO SIMULTANEOUSLY OPTIMIZE THE SIZES AND LOCATIONS OFBOTH THE EXISTING AND NEW INSTALLED SUBSTATION AND FEEDERS BYCONSIDERING RELIABILITY CONSTRAINTS. TO CLARIFY THE CAPABILITIES OFTHE PRESENTED METHOD A TYPICAL NETWORK IS CONSIDERED AND THERESULTS OF APPLYING GA AND BFOA ON THE NETWORK ARE COMPARED.THE SIMULATION RESULTS DEMONSTRATE THAT THE BFOA HAS THEPOTENTIAL TO FIND MORE OPTIMAL RESULTS THAN THE OTHER ALGORITHMUNDER THE SAME CONDITIONS. ALSO, THE FAST CONVERGENCE, CONSIDERATION OF REAL-WORLD NETWORKS LIMITATIONS AS PROBLEMCONSTRAINTS AND SIMPLICITY IN APPLYING TO LARGE SCALE NETWORKS ARETHE MAIN FEATURES OF THE PROPOSED METHOD.

Yearly Impact:   مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 108

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 60
Author(s): 

KIANI RAD H. | MORAVEJ Z.

Issue Info: 
  • Year: 

    2015
  • Volume: 

    4
  • Issue: 

    3
  • Pages: 

    177-184
Measures: 
  • Citations: 

    0
  • Views: 

    300
  • Downloads: 

    162
Abstract: 

In recent years, significant research efforts have been devoted to the optimal planning of power systems. Substation Expansion Planning (SEP) as a sub-system of power system planning consists of finding the most economical solution with the optimal location and size of future substations and/or feeders to meet the future demand. The large number of design variables, and combination of discrete and continuous variables makes the substation expansion planning a very challenging problem. So far, various methods have been presented to solve such a complicated problem. Since the Bacterial Foraging Optimization Algorithm (BFOA) has been proper results in studies of power systems, and has not been applied to SEP problem yet, this paper develops a new BFO-based method to solve the SEP problem. The technique discussed in this paper uses BFOA to simultaneously optimize the sizes and locations of both the existing and new installed substation and feeders by considering reliability constraints. To clarify the capabilities of the presented method a typical network is considered and the results of applying GA and BFOA on the network are compared. The simulation results demonstrate that the BFOA has the potential to find more optimal results than the other algorithm under the same conditions. Also, the fast convergence, consideration of real-world networks limitations as problem constraints and simplicity in applying to large scale networks are the main features of the proposed method.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 300

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 162 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 1
Author(s): 

NAJAFI RAVADANEGH S.

Issue Info: 
  • Year: 

    2014
  • Volume: 

    10
  • Issue: 

    1
  • Pages: 

    65-74
Measures: 
  • Citations: 

    0
  • Views: 

    433
  • Downloads: 

    202
Abstract: 

Abstract: The connection points between MV and LV distribution networks are MV substations. Optimal sitting, sizing and timing of MV substation placement is the major planning problem in MV-LV distribution system planning projects. In this paper the optimal MV substation placement problem is solved using Imperialist Competitive Algorithm (ICA) as a new developed heuristic optimization algorithm. This proposed procedure is determined the optimal location, capacity and installation time of MV substation, regarding the operating and optimization constraints. A multistage and pseudo dynamic expansion planning methodology is applied to consider uncertainties in network parameters such as forecasted load, asset management and geographical constraints. In order to evaluate the efficiency of the proposed method obtained by ICA, a sensitivity analysis for the effect of ICA parameters on obtained results is applied. A graphical representation of results is used to illustrate the efficiency and capability of the procedure both from the planning and graphical aspects. The proposed method has been tested on a real size distribution network.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 433

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 202 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    2004
  • Volume: 

    19
Measures: 
  • Views: 

    187
  • Downloads: 

    0
Abstract: 

DIGITAL AND IT TECHNOLOGY HAVE BEEN DEVELOPED IN RECENT YEARS, SO THE CONVENTIONAL SUBSTATION CONTROL HAS CHANGED TO DISTRIBUTED AND DIGITAL CONTROL SYSTEM. ONE FEATURE OF EVERY SYSTEM IS AVAILABILITY, SO IN THIS PAPER, THE AVAILABILITY OF TRANSMITTAL CONTROL FUNCTION FROM SUBSTATION OR NETWORK LEVEL OF SOME SUBSTATION CONTROL SYSTEM ARE COMPARED. THESE RESULTS HAVE BEEN DERIVED:THE SIMPLE STAR TOPOLOGY HAS LOW MTTF AND RELIABILITY, BUT BY CONSIDERING SEPARATE HMI AND SERVER GATEWAY, THESE FEATURES INCREASE RAPIDLY. IF A REMOTE HMI ADDED, THE MTTF INCREASED BUT A LITTLE, BECAUSE OF REDUNDANCY IN A SMALL PART OF SYSTEM LIKE HMI.BY CONSIDERING SERIAL SWITCH FOR COMMUNICATION TO NETWORK LEVEL WHEN NCC SERVER AND SA SERVER ARE THE SAME, THE RELIABILITY DECREASES BECAUSE OF SERIAL COMPONENTIT YIELD THAT RING TOPOLOGY HAS LESS AVAILABILITY THAN STAR TOPOLOGY.IN RTU_BASED SYSTEMS, BECAUSE OF SIMPLICITY OF I/O UNITS AND THEIR BETTER MTTF, THE AVAILABILITY IS BETTER THAN SA SYSTEM. BUT, WHEN MAINTENANCE IS CONSIDERED, BECAUSE OF COMMON CONTROL COMPONENT (RTU) AND LOSS OF REDUNDANCY, THE AVAILABILITY BECOMES LESSER THAN SA SYSTEM.

Yearly Impact:   مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 187

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0
Writer: 

SHOARINEJAD ARASH

Issue Info: 
  • Year: 

    2004
  • Volume: 

    19
Measures: 
  • Views: 

    205
  • Downloads: 

    1494
Abstract: 

THE PAPER PROVIDES A BRIEF EXPLANATION OF THE AUTOMATION AND SCADA INDUSTRY ALONG WITH NETWORKING SCHEMES. PROTOCOLS AS A CRUCIAL PART OF THE SYSTEM ARE EXPLORED IN DEPTH. IN ADDITION, COMMONLY USED PROTOCOLS AND STANDARDS ARE MENTIONED CONCISELY. THE NEWEST INVENTION OF THE IEC STANDARDS COMMITTEE, KNOWN AS IEC 61850, IS ALSO INTRODUCED. IEC 61850 AND UCA HAVE PROMISING ADVANTAGES OVER OTHER PROTOCOLS AND WILL GREATLY CHANGE SCADA SYSTEMS TODAY. ALSO, A GENERAL GUIDELINE IS PROVIDED FOR PROTOCOLS, WHICH IS THEN USED TO CREATE A COMPARISON CHART FOR THEM.

Yearly Impact:   مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 205

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 1494
Issue Info: 
  • Year: 

    2015
  • Volume: 

    1
Measures: 
  • Views: 

    149
  • Downloads: 

    56
Abstract: 

MAIN GOAL OF DISTRIBUTION NETWORKS DESIGN AND EXPANSION IS TO RESPOND TO ELECTRICITY CONSUMPTION GROWTH WITH THE MOST EFFICIENCY, WHILE NOT CONTRAVENE THE CONSTRAINTS GOVERNING THE SYSTEM. HIGH AMOUNT OF INVESTMENT AND ALONG WITH THE EVER-INCREASING DEMAND FOR ENERGY AND EQUIPMENT PRICE GROWTH MAKE THE DESIGNERS CONCENTRATE ON MORE PRECISE AND SUITABLE WAYS TO DESIGN THESE NETWORKS. APPEARANCE OF DISTRIBUTED GENERATION IN DISTRIBUTION SYSTEMS IN ADDITION TO CHANGE IN OPERATION STAGES OF THESE SYSTEMS HAS PROVIDED THE ABILITY FOR THESE COMPANIES TO DESIGN SYSTEMS WITH LOWER COST. TO GAIN THIS GOAL, THE DESIGN OF DISTRIBUTION SYSTEMS SHOULD BE REVISED. THIS PAPER PRESENTS A NEW METHOD TO OBTAIN THE NUMBER, LOCATION, CAPACITY AND SERVICING AREA OF EACH SUB-TRANSMISSION SUBSTATION THROUGH CANDIDATE AND AVAILABLE SUBSTATION LOCATIONS, CONSIDERING THE POSSIBILITY OF DG INSTALLATION ON ANY OF LOAD CENTERS, WHERE THE UNCERTAINTY OF FORECASTED LOAD OF EACH LOAD CENTER IS CONSIDERED AS A FUZZY MODEL. IN THIS METHOD THE OPTIMIZATION IS PERFORMED USING GENETIC ALGORITHM WITH CONSTRAINTS INCLUDING VOLTAGE DROP, SUBSTATIONS AND DGS LOADING CAPACITY AND UNIDIRECTIONAL CONNECTION BETWEEN SUBSTATIONS AND LOADS.

Yearly Impact:   مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 149

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 56
litScript
email sharing button
telegram sharing button
whatsapp sharing button
linkedin sharing button
twitter sharing button
email sharing button
email sharing button
sharethis sharing button